Bay Area planning tool

ADU Cost Calculator

Estimate Bay Area ADU, JADU, detached ADU, attached ADU, and garage conversion costs before drawings get expensive.

ADU type

Methodology

This calculator does not pretend one cost per square foot solves the project.

A useful ADU estimate has to split the work into fixed project costs, size-driven construction, city and finish multipliers, utility risk, permit/design work, and a contingency reserve.

City matters

Bay Area labor, access, and review paths vary. Palo Alto is not the same pricing environment as a generic national calculator.

Garage conversions are their own animal

The structure exists, but slab, ceiling height, insulation, fire separation, utilities, and shell repairs can swing the number hard.

Permit work is not free

Drawings, coordination, plan check responses, and licensed professional support need their own budget line.

Fabuhome ADU floor plan used for budget planning

Scope

Use it for detached ADUs, attached ADUs, JADUs, and garage conversion ADUs.

The model is intentionally editable. Once Fabuhome has more real project data, we can tune city multipliers, fixed costs, soft costs, and garage risk factors without rebuilding the page.

Sources

Grounded in official permit paths and current market ranges.

The model uses public ADU process references and Bay Area planning assumptions. It should be updated as real Fabuhome project data replaces estimates.

FAQ

ADU cost questions before design starts.

These are the decisions that change the budget before a plan set exists.

How accurate is this ADU cost calculator?

It is useful for early planning, not bidding. It gets sharper after drawings, site review, utility review, and city-specific permit feedback.

Why are garage conversion ADUs not always cheap?

The garage shell helps, but slab condition, ceiling height, insulation, fire separation, plumbing, electrical, and shell repairs can still make the project expensive.

Does this include permits and drawings?

Yes, the estimate includes a separate planning line for design, permit, and coordination work. Final costs depend on the city and scope.